The Suez Canal is considered to be the shortest link between the east and the west due to its unique geographic location; it is an important international navigation canal linking between the Mediterranean sea at Port said and the red sea at Suez. The idea of linking the Mediterranean sea with the red sea by a canal dates back to 40 centuries as it was pointed out through history starting by the pharaohs era passing by the Islamic era until it was dredged reaching its current condition today.
------------------
It is considered to be the first artificial canal to be used in Travel and Trade. The Whole Idea of establishing a canal linking between the red sea and the Mediterranean dates back to the oldest times, as Egypt dredged the firs artificial canal on the planet’s surface. The pharaohs dredged a canal link in between river Nile and the red sea. This canal ran a while and then stopped until Muslims conquered Egypt under the leader ship of Amr-Ebn-El-Aas complying with the orders of Omar Ebn El Khattab. When the Portuguese discovered Ras El Raga El Saleh at the beginning of the 16th century the world trade movement changed making Egypt and Alexandria not considered the heart of it anymore.
----------------------
After that it was Francis Delicips the one with the idea of re-dredging the Canal in (25 April, 1859) and was formally opened during the ruling of El Khedive Ismael (17 November, 1869) in a major celebration which was attended by most of Europe’s kings and Princes and the license period was 99 years from the date of opening of the canal and then it becomes after that a property of the Egyptian Government, and the French owned most of its stock.
----------------------
After July 1952 Revolution, president Gamal Abd El Naser publicized the canal in announcement in (26 July, 1956) making the management of the canal a 100% Egyptian, which enraged the major countries leading to the Triad assault on Egypt in (29 October, 1956) which caused to the closing of the canal and it was reopened in (march 1957) and after that it was closed again ( 1976) due to the ships laying in the bottom of the canal and was not reopened again until (June 1975).
-------------------------
The dredging of the canal took almost 10 years using Egyptian labor, and it was opened for navigation for the first time in 17 November, 1869. Its depth was about 8 meters, its water are was 304 m2 and the largest ship load that can pass through was 5000 tons, which was typical for ships sizes in these days. As the ships developed and increased its sizes, the canal needed to be developed, which happened when it was still a foreign joint venture before being publicized to take ships with depth of 35 feet and its water area to be 1100 m2 by the end of 1956 and when the canal was publicized by the Egyptian government on the 26th of July, 1956. The Egyptian administration was keen to develop the
-------------------------
In May 1962, the water area of the canal was to reach 1800 m2 and the allowed depth to 38 feet. In June 1966, a development was to be executed on 2 stages as it was announced the depth would reach 48 and 58 feet consecutively. This program was started in February 1962, but was soon halted due to the war that erupted on the 5th of June, 1967. It was reopened for international; navigation in June 1975 after purifying it from the ships that sank in its bottom during in the 1962 and 1973 wars with the same water area and depth before it was closed. The development projects then started by the Egyptian administration in order to receive ships of a 210,000 tons load, specially after increasing the water are to 4800 m2 and a depth of 62 feet , with a length of 190.25 km, in addition to the redesign of the canal's turns so that each one has a half radius of at least 5000 m and also dredging a new verge starting from the 17th km south of port said heading directly to the Mediterranean east of port Fouad to allow the loaded ships going north to go to the sea without passing through port said port. The Suez canal is distinguished by its stable level of water which varies very slightly having the highs tide reaching 50 cm in the north while reaching up to 2 m in the south.
------------------
Vice Admiral/Ahmed Fadel has assured head of the Suez Canal port authority, the depth will reach 66 feet by 2006 pointing out that this stage will enable all container vessels; about 17,000 container vessels; as well as taking all bulk vessels world wide. His Excellency also pointed that the Canal will be able to take in about 99 % of all methods used in world maritime transport after reaching a depth of 72 feet in 2012, as well as taking about 99% of he dead weight tons for the bulk vessels 82% of the petroleum tanks and a 100% of all the remaining types of ships used in maritime transport; specially container vessels with all its future generations; in addition to empty vessels reaching up to 560 thousand tons.
------------------